#Softedemy,#PrimaveraP6,#ActivityID
During the project life cycle maybe, you need to change “Activity ID” in order to update your project, add some new activities and delete the old one, this is my solution for easily changing Activity ID in minimum time with a high level of accuracy.
How to Change Activity IDs by Export and Import | Primavera P6 Simple Easy and Fast Method | Tips |
Time Stamps
0:00 Introduction to the Video Activity IDs Change.
0:44 Export Project Activity to Excel xlsx file/User Defined Field.
02:24 Vlookup New Activity ID from Other Excel File.
03:46 Import Back New Excel updated Project File.
04:38 Global Change to replace old to new Activity Id.
05:31 Closing Out of video session.
Link for the practice of video session.
Exported File From Primavera P6 Excel file link.
https://tinyurl.com/t7r5edu4
New Activity Id Excel File Link
https://tinyurl.com/2xarutj5
Project Primavera P6 Xer file link for practice
https://tinyurl.com/4w6cftvw
Related Video Link
How To Renumber Activity IDs For All Activities In An Ascending Order In Primavera P6 | Tips
https://youtu.be/AYU6K1QcYVI
How to set Default Activity IDs numbering | Modify Activity Suffix and Prefix | Primavera P6 | Tip |
https://youtu.be/EHQyz9QabEs
How to Maintain an Activity Change Log | Primavera P6 | UDFs | Activity Steps | Delay log | Hacks
https://youtu.be/YPmw6GhcA38
Update Progress using Activity Steps | Create Template | Performance Percent | Primavera P6 Tips
https://youtu.be/0keoRZiVV3k
How to Create Activity Steps to Update Physical Progress | Primavera P6 |19.12 | Advanced Tutorial
https://youtu.be/FHoN_3vwBGg
How to Create Activity | Primavera P6 | 19.12 | 18.8 | Latest 2020
https://www.youtube.com/watch?v=SUsUav2wFFI
How to Create and Assign Activity Codes to Activities | Primavera P6 | 19.12 | Beginners Tutorial